Gold Mark achieved many different works are as follows:

 

And it is pleased to give us the opportunity to be one of the companies you deal with them and in order to show you and enjoy your trust in our experience.

 

 

Foundation Gold Mark concluded a contract with Nabors Drilling Ltd. on 2009 Buna Hayek fence location thousand

Pace Safer stature Cold Mark implemented with the best application and mastering work was received from the site manager Rob

 

 

 

Foundation Gold Mark signed a contract with Nabors 2010 m Buna 3 large gates a Safer thousand location with drilling large bases sought every single gate 24 meters height of 3 meters with the settlement of the site and Building

 

 

 

Foundation Gold Mark taller a contract with Yemen Company for Investments oil and Icon Buna Wall Sheik iron End +2 gates large for the passage of knower company staffed by CMC Seguin on 2010, as demand from companies staffed to be material from Saudi Arabia was the best of Macon.

 

 

 

 

 

Foundation Gold Mark has a contract with Yemen Company for Investments oil and Icom restored motion sofas homes and numbering 85 housing units + 2 large restaurants Snir + Gnir + 2 central workshop and workshop turning on 17/11/2011

 

 

 

Company has been contracted and Icon change sewage sofas full + rooms en 2012

- A team cousins ??excavations different End =

 foundry. Carpentry. Electricity. Coating. Etc. ...

 

 

 

  Foundation Gold Marc taller a contract with Yemen Company for Investments oil maintenance and welding Tank water Eladitrut right Akron and equipment at the site + 4 Crane 50 tons +3 generators 500 kilometers + generators of various sizes and strengths + Bald user on 04/04/2012

 

 

 

 

 

- Workers were asked by the Gould Foundation Marc more than 500 workers during the years 2010 -2011 AD -2012 AD

 

 

 

 

 

Foundation Gold Marc has a contract with the company and Icon supply of diesel to the site, which amounts to the amount of White per 30,000 thousand liters from 2009 m to 2013 m and Sayre effect

Construction and completion and maintenance of roads and waterways and healthy rain,

 and other services to the path of  Marib (Phase III) for the Ministry of Public Works )

(Contract No: e i / 126)

 

 

 

And completion of a construction project by freeing the second phase with Alkrschmi {contract number:E125}

 

Core business of Project

Clean and paving the way for work Altthbytip classes and casting and casting biz GRADE

the work of the 2 bridge joint venture with Sheen Al-Ghana

Business Hvarriet, phrases, and change paths and water lines

 

The way for a business line project of the ring line 100 Sana'a {Contract No.: ADD.P.B7 / 2006}

Core business of Project :

Clean and paving the way for work Altthbytip classes and casting and casting biz GRADE

the work of layers and layers of casting install BES

Filling the supply and transport to work sites

the owner of the Project: Ministers of Public Works

Main Contractor: Al-Selah Demean Construction of the roads and bridges

contractor soles: Mark Gould Foundation

 

Project brushes and mixing and Dahl layer through the foundation for military units

 {contract number: 1 / T / 08 / i}

Core business of Project:

Clean and paving the way for the business classes Altthbytip length of 68 linear Tm

the work of the foundation layer, layers and layers of casting install BES

Filling the supply and transport to work sites

the owner of the project: Council of Ministers for follow-up committee security decisions

Main Contractor: Al Wagih General Trading and Contracting

 

Draft gas pipeline from station to Safmarb Balhaf {contract No.: 33 388}

Core business of Project:

work through the longitudinal length of 200 km to cross the excavators and cranes to dig, and pipelines

Supply and Shipping of Reclamation and Jach to work sites

the owner of the project: Yemen LNG

Main Contractor: Al AMEX me

Subsoil Contractor: Company Global Hawk

 

 

 

 
  Untitled-1

 

 

 

 

Construction project based housing Almazvin power station [ number: 33388-06]

Core business of :

Create the administrative building and housing a power plant Marib Safer

the owner of the Project: Saudi Aramco

Main Contractor: Al Barcan

Subsoil Contractor: GOLD MARK Foundation

Pictures and realistic implementation of some of the installations

 

Some of our the project a military camp for Republican Guards  for in Marib

Which consist of :

Ten Concrete building.( 6 accommodation, 2 for Leading and 2 for services]

Two prefab buildings ] the Length 80m and width 60

stores

Fencing with length 2700m

 

 

 

 

 

 

Road Construction :-

 

 

 Gold Mark is also involve in road construction activities.

We carried out road projects located in HADRAMOOT Governorate.

For Example:-

The Interior road for the city such as :

- Roads and rugged and to Camp the bridge site

Road with length 12000m and width 6m

 

 

 

 

 

 

Engineering and Construction

Camp construction Gold Mark is  capable of construction camps and supplying Caravan for the clients. (Feb,2006) CPU Camp ( July, 2007) for SITCCO Company.

We supplied them with electricity,

 connections , water system, sanitary work,

 and maintenance for each   the generator,

water refueling, black water,

 clean and remove the rubbish